Hi Everyone,

We just received the samples of the new casting from the manufacturing run and it is good. The manufacturer is now finishing the tools (injection moulding the tyre lever tip, heat treating, bead blasting, machining the thread and inserting the magnets). 

They have estimated that all the breakers will be ready to be picked up by our freight forwarder around the 10 November. This is when they will be shipped to the UK (there is a 10 days shipping lead time). In the UK they will be dispatched in two lots. The first lot will be all the tools that do not require engraving and then around a week later all the tools with engraved names will be dispatched.

Sorry again for the delay. Let's hope things run more smoothly from here on in.

Cheers

Mark

October 18, 2015 — Mark Windsor